Project Description
Client: Gilbane Construction
Location: South Windsor
Surface Area: 35,000.00
Year Completed: 2017
Value: $529,495.00
Costa & Son, LLC Performed:
Sitework Construction
- Concrete Sidewalk and Monolithic curbs
- Full Extruded Concrete Curb
- Concrete Colorized Entrances
- ADA Ramps
- Reinforced Concrete Pads for Dumpster/ Generator
- Reinforced Concrete for Loading Dock
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.