Project Description

Client: Town of Manchester
Location:  Bissell Street and Maple Street – Manchester, CT
Year Completed: 2016
Value: $348,372.50

Work Performed by Costa & Son, LLC

Site Preparation

  • Excavation, Placement, and Disposal of Surplus Material

Roadway Construction

  • Formation of Subgrade
  • Bituminous Concrete Roadway and Parking Areas
  • Reset Granite Curbing
  • Precast Concrete Curb
  • Cast-In-Place Concrete Curb
  • Remove Miscellaneous Concrete
  • Concrete Sidewalks and Ramps
  • Concrete Driveway Apron
  • Bituminous Concrete Driveway
  • Bituminous Concrete Curb

Drainage & Utilities

  • Catch Basins and Storm Manholes
  • Culverts

Incidental Construction

  • Restoration of Lawn and Wetland Areas and Erosion Control Banket
  • Maintenance and Protection of Traffic
  • Replace Signs